This website has been designed with accessibility in mind. We are working towards having the content meet compliance of the Web Content Accessibility Guidelines 2.0 Level AA. Documents from external organizations may not be accessible. If these documents are required in an accessible format, please call 905-404-0888.
In accordance with Condition 15 of the Environmental Compliance Approval (ECA), an annual report is prepared summarizing the Durham York Energy Centre operations. The annual reports include information on incoming waste and outgoing residual material such as ash and metals, conclusions from environmental monitoring programs, electricity production, equipment malfunctions and corrective actions, a summary of complaints and details of the Energy From Waste Advisory Committee activities.